• Pile Length Solar Pile Driver Use for Solar PV Plant Ground
  • Pile Length Solar Pile Driver Use for Solar PV Plant Ground
  • Pile Length Solar Pile Driver Use for Solar PV Plant Ground
  • Pile Length Solar Pile Driver Use for Solar PV Plant Ground
  • Pile Length Solar Pile Driver Use for Solar PV Plant Ground
  • Pile Length Solar Pile Driver Use for Solar PV Plant Ground

Pile Length Solar Pile Driver Use for Solar PV Plant Ground

After-sales Service: 1 Year
Warranty: 1 Year
Type: Hydraulic Hammer
Samples:
US$ 22000/Set 1 Set(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Pile Length Solar Pile Driver Use for Solar PV Plant Ground pictures & photos
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
US $19,000-25,000 / Set
Min. Order: 1 Set
Diamond Member Since 2015

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Applications
  • Packaging & Shipping
  • Company Profile
Overview

Basic Info.

Model NO.
HWL400R
Pressure Pile Driver Type
Hydraulic Pile Driver
Pile Hammer Type
Hydraulic Hammer
Power Source
Diesel
Motor Power
85kw
Noise
With Noise
Certification
CE, ISO 9001:2000, ISO 9001:2008
Condition
New
Product Number
Hwl400r
Hydraulic Hammer Model (mm)
75/85/100 O
Hydraulic Hammer Flow (L/Min)
50-110
Pile Height (mm)
According to The Slide
Hydraulic System Pressure (MPa)
22
Traveling Speed (Km/H)
3
Engine Power (Kw)
85
Engine Rated Speed (R/Min)
2600
Track Shoe Width (mm)
350
Track Single (Section)
42
Ravel Motor Reduction Ratio
1:54.4
Impact Frequency (BMP)
350-800
Vehicle Weight (Kg)
6200
Total Displacement of Walking Motor
53ml/R
Gear Pump Displacement (Ml/R)
40+40+25
Transport Package
in Nude
Specification
4m
Trademark
HW
Origin
Shandong, China
HS Code
8705109100
Production Capacity
100/Month

Packaging & Delivery

Package Size
580.00cm * 198.00cm * 290.00cm
Package Gross Weight
7600.000kg

Product Description

Product Description

HWL400R Solar Pile Driver
 

4m hydraulic rotary press piling machine is

multifunctional pile driving machine for solar pile

project, with 360 degrees of freedom to rotate, multi

angle pile function. The machine with diesel powered

, hydraulic mechanical transmission, with high

efficiency, convenient shift, multi angle multi angle pile,

high precision, durable, time-saving, labor-saving and,

especially for engineering construction in the field.
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
Product Parameters

 

Product number

HWL400R

Hydraulic hammer model (mm)

75/85/100 optional

Hydraulic hammer flow (L/min)

50-110

Impact frequency (bmp)

350-800

Drill rod diameter (mm)

75/85/100

Walking motor torque (N.m)

<11500

Pile height (mm)

According to the slide

Sliding guide frame inclination angle (°)

(Left) 5(Right) 5

Frame rotation angle (°)

360

Hydraulic system pressure (mpa)

22

Gear pump displacement (ml/r)

40+40+25

Traveling speed (km/h)

3

Vehicle weight (kg)

6200

Engine power (kw)

85

Engine rated speed (r/min)

2600

Track shoe width (mm)

350

Track single (section)

42

Total displacement of walking motor (ml/r)

53

Rated pressure of walking motor (mpa)

30

Travel motor reduction ratio

1:54.4

Dimensions (mm)

 

4420*1920*4900-7900(working state)
4500-7500*1920*2800(transportation status)
If you want to know more parameters, please contact me and I will send it to you
Detailed Photos
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
Large power head

This pile driver equipped with a large power head, the

size of the pile cap can be customized.
Steel track chassis

The engineering steel crawler chassis makes pile

driver walking and work more stable and reliable than

the rubber crawler.
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
Centralized operation control platform

The centralized operation control platform makes the

operation more simple and convenient
Air compressor connection port

In addition to piling, this machine can also be

connected to the air compressor for drilling hole
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
If you want to know more details, please contact me, our product manager will explain more to you
Applications

Pile Length Solar Pile Driver Use for Solar PV Plant GroundThe following practical pictures of photovoltaic pile drivers are feedback from customers in Vietnam, Saudi Arabia, Romania, Mexico, South Africa, the Philippines, Malaysia, Colombia and other countries.
We also have many practical videos of pile drivers sent by customer service.
If you are interested, you can Contact us and send it to you! ! !

Packaging & Shipping

Pile Length Solar Pile Driver Use for Solar PV Plant Ground

This model pile driver should be loaded into a 40GP;small one can be loaded into one 20 feet container.
Company Profile
Jining Hengwang Mining Machinery Co., Ltd. which belong to Shandong Hengwang Group Co., Ltd., is located in Shiqiao Industrial Park, Jining City, Shandong Province, China. Our Group occupies an area of about 40,000 square meters.It is a comprehensive enterprise integrating piling and drilling rig design, manufacture and installation.
10 Years Manufacturing Experience
2 Production Bases
5 Overseas Branches
3 Overseas Spare Parts Center
118 Overseas After-sales Outlets
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
1.Payment : I:100% T/T
                     II:30% advaced and the balance paid before delivery
                     III:credit letter at sight
2.MOQ:1Pcs
3.Port of loading: Qingdao Port or others
4.Price term:FOB Qingdao price
5.OEM:we are pleased to be your OEM factory

Contact now
Action Now Contact us.
FAQ
1) ,What is your terms of payment?
TIT 30% as deposit, and 70% before delivery. We'll show you the photos of the products and
packages before you pay the balance.

2), What is your terms of delivery?
EXW, FOB, CFR, CIF.

3),How about your delivery time? 
Generally, it will take 7-10 working days after receiving you advance payment The specific
delivery time depends on the items and the quantity of your order

4),What is the warranty of our machine?
Our main machine enjoys a?1 year warranty(except for the hammer). during this time all
accessories broken can be changed for a?new one And we provide videos for machine install and
operation.

5), What is your terms of packing?
Generally, we use standard exported wooden case for LCL goods, and fixed well for FCL goods.

6),Do you test all your goods before delivery?
Yes, we have 100% test before delivery.And we will attach our inspect report for every machine.

7),Do you Preferred provide wear parts for transacted clients?
Yes, we have records for your clients, and will prefer providing accessories to clients.

8)How do you make our business long-term and good relationship?
1 We keep good quality and competitive price to ensure our customers benefits;
2 We respect every customer as our friend and we sincerely do business and make friends with
them, no matter where they come from.


9), Do you have any certificates for your machine??
All of our products coming with the
certificates of CE, S09001.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Pile Length Solar Pile Driver Use for Solar PV Plant Ground pictures & photos
Pile Length Solar Pile Driver Use for Solar PV Plant Ground
US $19,000-25,000 / Set
Min. Order: 1 Set
Diamond Member Since 2015

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
291
Year of Establishment
2011-10-24