After-sales Service: | Yes |
---|---|
Warranty: | 1year |
Certification: | CE, ISO 9001:2000, ISO 9001:2008 |
Still deciding? Get samples of US$ 11000/set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine parameter
|
Model
|
HW-190L
|
Drilling depth(m)
|
190
|
|
Open hole dia. (mm)
|
500, 220
|
|
End hole dia. (mm)
|
75
|
|
Drill rod dia. (mm)
|
42,50
|
|
drill angle (° )
|
90-75
|
|
Matching engine power (kW)
|
13.2
|
|
Weight without power (kg)
|
3400
|
|
Dimension L*W*H(m)
|
3.8*1.95*2. 7
|
|
Drill tower
|
Rated load (ton)
|
18
|
Height (m)
|
6.5
|
|
Mud pump
|
Flow (L/min)
|
160
|
Max. pressure (MPa)
|
1.3
|
|
Reciprocating times/min
|
165
|
|
Model
|
HW-160L
|
Drilling depth(m)
|
160
|
Open hole dia. (mm)
|
500, 220
|
End hole dia. (mm)
|
75
|
engine power (kW)
|
13.2Kw
|
Weight(Kg)
|
3350
|
Model
|
HW-230L
|
Drilling depth(m)
|
230
|
Open hole dia. (mm)
|
500, 273
|
End hole dia. (mm)
|
75
|
engine power (kW)
|
15
|
Weight(Kg)
|
3600
|
Shandong Hengwang Group Is located in Shiqiao Industrial Park, Beihu Provincial Tourist & Resort Area, Jining city ,Shandong Province,covers an area of 40000 square meters, is a collection of pile driving machinery , driling machine and conctruction machinery design,manufacture and installation of an integrated enterprise.
Our company produces the piling machinery a total of 10 major series more than 20 varieties,water well driling rig machine,Construction machinery and other hydraulic products. Widely used in civil engineering, municipal and building foundation construction of installation works. Can meet the roads, railways, Bridges, industrial and civil building, harbor wharf, the need for the basic construction of the dam seepage control and so on.
1) ,What is your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
2), What is your terms of delivery?
EXW, FOB, CFR, CIF.
3),How about your delivery time?
Generally, it will take 7-10 working days after receiving you advance payment The specific delivery time depends on the items and the quantity of your order
4),What is the warranty of our machine?
Our main machine enjoys a 1 year warranty(except for the hammer). during this time all accessories broken can be changed for a new one And we provide videos for machine install and operation.
5), What is your terms of packing?
Generally, we use standard exported wooden case for LCL goods, and fixed well for FCL goods.
6),Do you test all your goods before delivery?
Yes, we have 100% test before delivery.And we will attach our inspect report for every machine.
7),Do you Preferred provide wear parts for transacted clients?
Yes, we have records for your clients, and will prefer providing accessories to clients.
8),How do you make our business long-term and good relationship?
1 We keep good quality and competitive price to ensure our customers benefits;
2 We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
9), Do you have any certificates for your machine?
All of our products coming with the certificates of CE, S09001.