Secured Trading Service

Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development

Ji Ning Hengwang Mining Machinery Co., Ltd.
  • Audited Supplier
  • 12 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • Stable quality
  • Fast drilling
  • Multi-angle drilling

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development

Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development pictures & photos
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development pictures & photos
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development pictures & photos
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development pictures & photos
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development pictures & photos
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development pictures & photos
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
  • Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
  • Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
    Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
  • Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
    Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
  • Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
    Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
  • Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
    Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
  • Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
    Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
  • Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
    Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development

Find Similar Products

Product Description

Product Description

Integrated DTH Surface Drill Rig /blasting hole drilling rig

1.blasting hole drilling rig equipped with Yuchai YC6A260L-T20 191kw power pack 16 /17 Air compressor hole size :90 -138 mm and with dry dust collector.
2.HW452 Integrated DTH Surface drill rig with single power pack (only one diesel engine) to drive both screw air compressor and hydraulic system, compared with separated drill rigs, the fuel consumption reduced by 35% and maintenance cost down by 50%..
3.With global famous brand key hydraulic components, reliable for low maintenance cost.
4.Powerful two-speed hydraulic tramming mechanism with excellent off-road performance .Bigger and stronger designed rotation unit for smooth high torque output and less drill tool jamming.
5.Two stage dry dust collector for friendly environment and higher production efficiency. Integrated design (air compressor on board ) for better long-distance fleet management.
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Specification
Model
HW452
Engine
Yuchai YC6A260L191 kW
Hole Depth
20m
Drill Pipe Sizes
76 X 3000 mm
Hole Dia
110-138 mm
DTH Hammer
4"
Rotation Torque ( Max.)
2500 N.m
Rotation Speed
0-100 rpm
Working Pressure
17bar
F.A.D
16m3/min
Tramming Speed ( Max.)
3 km/h (High Speed)
2 km/h (Low Speed)
Gradient
23°
Track Frame Oscilation
±14°
Total Weight
11300 kg
Transportation Dimensions
7567X2500X2900 mm
Dry Dust Collector
Standard
Dual Speed Walking Motor
Standard
Details Images
Rock blasting drilling rig advantage :
HW452 Integrated DTH Surface drill rig with single power pack (only one diesel engine) to drive both screw air compressor and hydraulic system, compared with separated drill rigs, the fuel consumption reduced by 35% and maintenance cost down by 50%..
 
With global famous brand key hydraulic components, reliable for low maintenance cost.
4.Powerful two-speed hydraulic tramming mechanism with excellent off-road performance .Bigger and stronger designed rotation unit for smooth high torque output and less drill tool jamming.

Two stage dry dust collector for friendly environment and higher production efficiency. Integrated design (air compressor on board ) for better long-distance fleet management.
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
 
 
Product Usage
Rock blasting hole drilling rig mainly used in Hydropower engineering ,open pit mining ,road works ,drilling and blasting for defense engineering .
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Company Profile
Shandong Hengwang Group Is located in Shiqiao Industrial Park, Beihu Provincial Tourist & Resort Area, Jining city ,Shandong Province,covers an area of 40000 square meters, is a collection of pile driving machinery , drilling machine and construction machinery design,manufacture and installation of an integrated enterprise.
Our company produces the piling machinery a total of 10 major series more than 20 varieties,water well drilling rig machine,Construction machinery and other hydraulic products. Widely used in civil engineering, municipal and building foundation construction of installation works. Can meet the roads, railways, Bridges, industrial and civil building, harbor wharf, the need for the basic construction of the dam seepage control and so on.
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development
Certifications
Hengwang 15m Crawler Mounted Mining DTH/Down The Hole Split/Integrated Rock Blast/Blasting Hole Drill/Drilling Rig for Gold Mine Development

FAQ
Q:Are you manufacturer? 
A: Yes, we are factory with more than 20 years of manufacturing experience. 
 
Q:What is your terms of payment? 
 A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packagesbefore you pay the balance. 
 
Q:What is the warranty of our machine?
 A:Our main machine enjoys a 1 year warranty, during this time all accessories broken can be changed for anew one.And we provide videos for machine install and operation. 
 
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
 
Q:How do you make our business long-term and good relationship? 
 A:We keep good quality and competitive price to ensure our customers benefits; 
 
Q:Do you have any certificates for your machine? 
A: All of our products coming with the certificates of CE, IS09001.

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2451803". Items marked "verified" are certified.

Watch Video
Watch Video
Ji Ning Hengwang Mining Machinery Co., Ltd.
Ji Ning Hengwang Mining Machinery Co., Ltd.
Ji Ning Hengwang Mining Machinery Co., Ltd.
Ji Ning Hengwang Mining Machinery Co., Ltd.
Ji Ning Hengwang Mining Machinery Co., Ltd.
Ji Ning Hengwang Mining Machinery Co., Ltd.
Ji Ning Hengwang Mining Machinery Co., Ltd.
Ji Ning Hengwang Mining Machinery Co., Ltd.

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory & Trading Company
Address
Floor 24, Block C, Haineng International, No. 6, Jinyu Road, Rencheng Zone,Jining, Shandong, China (Mainland)
verified Plant Area
2000 square meters
verified Number of Employees
216
verified Registered Capital
10,800,000 RMB
verified Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment, Western Union
verified International Commercial Terms(Incoterms)
FOB, CIF, CFR, EXW
verified Average Lead Time
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
verified Nearest Port
Qingdao Port
verified Minimum Order Quantity
1 set
verified Supply Chain Partners
2

Our Production Capability & Technical Expertise

verified Main Products
Mining Machine, Drilling Machine, Railway Equipment, Road Machinery, Electrical Equipment, Hydraulic Tools, New Energy, Pump, Piling Machine, Exploration Equipment
verified Production Lines
3
verified Production Machines
Laser cutting machine, Bending machine, Assembly line
verified QA/QC inspectors
28 people
verified Inspection Type for Finished Products
100% inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Finished product checked by packing staff
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization
verified R&D Engineers
20 people
verified Traceability of Raw Materials
Yes

Our Industry Experience & Global Business Record

verified Year of Establishment
2011-10-24
verified Export Year
13 years
verified Main Markets
South America, Europe, Southeast Asia/ Mideast
verified Repeat Buyers Choice
50%~80%
verified Number of Foreign Trading Staff
55
verified Overseas Agent/Branch
Yes
verified New Products Launched in Last year
Yes

Our Certifications, Standards & Industry Recognition

verified Product Certification
CE
verified Cooperated with Fortune 500
Yes

FAQ

Are you a manufacturer?
Yes, we are a factory with more than 20 years of manufacturing experience.
What are your terms of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
What is the warranty period for the machine?
Our main machine enjoys a 1 year warranty, during this time all accessories broken can be changed for a new one. And we provide videos for machine install and operation.
How long is the delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
How do you ensure long-term business relationships?
We keep good quality and competitive price to ensure our customers benefits.
Do you have certificates for your machine?
All of our products coming with the certificates of CE, IS09001.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now