Product Description
3m hydraulic rotary press piling machine is multifunctional pile driving machine for mine, with 360 degrees of freedom to rotate, multi angle pile function. The machine with diesel powered, hydraulic mechanical transmission, with high efficiency, convenient shift, multi angle multi angle pile, high precision, durable, time-saving, labor-saving and, especially for engineering construction in the field.
Product Parameters
Product name |
HWL300R Crawler multifunctional photovoltaic pile driver |
Drilling diameter (mm) |
50-400 |
One-time advancing stroke (mm) |
300 |
Adapt to rock hardness |
F=6-20 |
Pitch angle of carriage (°) |
90 |
Machine weight (kg) |
5800 |
Climbing angle (°) |
35 |
Walking speed (kw/h) |
52.5 |
Air consumption (m3/min) |
10-26 |
Drilling depth (m) |
0-30 |
Drill rod diameter (mm) |
42/50/63/76/89/104 |
Drilling diameter (mm) |
60-800 |
Swing angle of carriage (°) |
45 |
Rotation speed |
0-70 |
Host frequency (kw) |
85 |
Dimensions (mm) |
4460*1850*2460 |
Working wind pressure(mpa) |
0.7-1.6(medium pressure) 1.6-2.46(high pressure) |
Detailed Photos
Centralized operation control platform
The centralized operation control platform makes the
operation more simple and convenient
Large power head
This pile driver equipped with a large power head, the
size of the pile cap can be customized.
Steel track chassis
The engineering steel crawler chassis makes pile
driver walking and work more stable and reliable than
the rubber crawler.
Air compressor connection port
In addition to piling, this machine can also be
connected to the air compressor for drilling hole
Chain anti-wear pulley
For this pile driver, we specially added the anti-wear
pulley of the chain, which increases the life of the chain
and improves the working performance of the whole
machine.
Customer Feedback
The following practical pictures of photovoltaic pile drivers are feedback from customers in Vietnam, Saudi Arabia, Romania, Mexico, South Africa, the Philippines, Malaysia, Colombia and other countries.
We also have many practical videos of pile drivers sent by customer service.
If you are interested, you can Contact us and send it to you! !
Packaging & Shipping
This model pile driver should be loaded into a 40GP;small one can be loaded into one 20 feet container.
Company Profile
Jining Hengwang Mining Machinery Co., Ltd. which belong to Shandong Hengwang Group Co., Ltd., is located in Shiqiao Industrial Park, Jining City, Shandong Province, China. Our Group occupies an area of about 40,000 square meters.It is a comprehensive enterprise integrating piling and drilling rig design, manufacture and installation.
FAQ
1) ,What is your terms of payment?
TIT 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
2), What is your terms of delivery?
EXW, FOB, CFR, CIF.
3),How about your delivery time?
Generally, it will take 7-10 working days after receiving you advance payment The specific delivery time depends on the items and the quantity of your order
4),What is the warranty of our machine?
Our main machine enjoys a?1 year warranty(except for the hammer). during this time all accessories broken can be changed for a?new one And we provide videos for machine install and operation.
5), What is your terms of packing?
Generally, we use standard exported wooden case for LCL goods, and fixed well for FCL goods.
6),Do you test all your goods before delivery?
Yes, we have 100% test before delivery.And we will attach our inspect report for every machine.
7),Do you Preferred provide wear parts for transacted clients?
Yes, we have records for your clients, and will prefer providing accessories to clients.
8)How do you make our business long-term and good relationship?
1 We keep good quality and competitive price to ensure our customers benefits;
2 We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.