After-sales Service: | Yes |
---|---|
Warranty: | Yes |
Certification: | CE, ISO 9001:2000, ISO 9001:2008 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Small crawler self-propelled 150m pneumatic drilling rig is a lightweight, efficient and multifunctional drilling equipment , it is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc.
Used in water well engineering,geothermal well, anchor pile hole and so on, and can be used with follow-pipe drilling. Small crawler self-propelled 150m pneumatic drilling rig has the advantages of whole machine hydraulic control, automatic loading and unloading drill pipe, crawler type chassis, large horsepower diesel engine, four hydraulic support leg balance, stronger terrain application ability and so on.
Model | HQZ260L | HQZ260L |
Drill Mast (m) | 3 | 6 |
Drilling diameter (mm) | 130-305 | 130-305 |
Drilling depth (m) | 260 | 260 |
Walking Speed (km/h) | 2.5 | 2.5 |
Main motor power | 76kw | 76kw |
Working pressure (mpa) | 1.7-3.0 | 1.7-3.0 |
Air consumption (m³/min) | 17-31 | 17-31 |
Drill pipe diameter (mm) | 76/89 | 76/89 |
Drill pipe length (m) | 1.5/2.0/3.0 | 3.0/6.0 |
Lifting force (T) | 17 | 17 |
Main feature
- Crawler walking is more suitable for muddy field movement.
-Pneumatic drilling rig, with air compressor, the efficiency is equivalent to 10~15 times of ordinary drilling rig.
-The drilling on the rock is mainly based on the down-the-hole hammer drilling process. The down-the-hole hammer rock drilling operation efficiency is high, and the drilling cost per meter is lower.