• Highway Guardrail Post Installation Hammer Pile Driver Equipment
  • Highway Guardrail Post Installation Hammer Pile Driver Equipment
  • Highway Guardrail Post Installation Hammer Pile Driver Equipment
  • Highway Guardrail Post Installation Hammer Pile Driver Equipment
  • Highway Guardrail Post Installation Hammer Pile Driver Equipment
  • Highway Guardrail Post Installation Hammer Pile Driver Equipment

Highway Guardrail Post Installation Hammer Pile Driver Equipment

After-sales Service: Yes
Warranty: Yes
Type: Vibration Piling Machine
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Highway Guardrail Post Installation Hammer Pile Driver Equipment pictures & photos
Highway Guardrail Post Installation Hammer Pile Driver Equipment
US $8,800-12,800 / Piece
Min. Order: 1 Piece
Diamond Member Since 2015

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
HWH920ZD
Pressure Pile Driver Type
Hydraulic Pile Driver
Pile Hammer Type
Hydraulic Hammer
Power Source
Diesel
Motor Power
55kw
Noise
With Noise
Certification
CE, ISO 9001:2000
Condition
New
Loader Type
920
Power Head Type
75
Power(Kw)
40
Impactor Type
110/150low Air Pressure
Drilling Diameter (Cm)
110-200
Drilling Depth(M)
1.4-2.6
Worktable Stroke
40-70cm
Size(M)
5*2.2*2.74
Weight
4t
Transport Package
Containers
Specification
4450*2700*2700mm
Trademark
HW
Origin
China
Production Capacity
300sets/Month

Packaging & Delivery

Package Size
445.00cm * 270.00cm * 270.00cm
Package Gross Weight
3930.000kg

Product Description

Product Description

Highway guardrail post installation hammer pile driver equipment 

The loader type pile driver is a product developed by Hengwang Group according to the market demand and its own technology. It is a new product integrating loading, piling and drilling. Adopt new design concept, meticulously developing the overall function, and the modularity and consideration of the structure, fully enclosed the wooden installation structure, more conducive to rapid installation and transition of the product, and can be widely applied to the pile hole drilling of road and high-speed road guardrails.
Highway Guardrail Post Installation Hammer Pile Driver Equipment
Highway Guardrail Post Installation Hammer Pile Driver EquipmentThe Guardrail pile driver specification:
 

Model

HWH920

Loader type

920

power head type

75

Power(kw)

40

Impactor type

110/150Low air pressure

Drilling diameter (cm)

110-200

Drilling depth(m)

1.4-2.6

Worktable Stroke

40-70cm

Size(m)

5*2.2*2.74

Weight

4T

The more specification about the pile driver machine and details show 
Highway Guardrail Post Installation Hammer Pile Driver EquipmentHighway Guardrail Post Installation Hammer Pile Driver EquipmentHighway Guardrail Post Installation Hammer Pile Driver EquipmentThe construction site working picture show
Highway Guardrail Post Installation Hammer Pile Driver Equipment

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Highway Guardrail Post Installation Hammer Pile Driver Equipment pictures & photos
Highway Guardrail Post Installation Hammer Pile Driver Equipment
US $8,800-12,800 / Piece
Min. Order: 1 Piece
Diamond Member Since 2015

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
291
Year of Establishment
2011-10-24