2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair

Product Details
After-sales Service: Support
Warranty: 1 Year
Type: Hydraulic Hammer
Still deciding? Get samples of US$ 7500/Set
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
R&D Capabilities
The supplier has 20 R&D engineers, you can check the Audit Report for more information
Self-branded
The supplier has 1 Self-brands, check the Audit Report for more information
Overseas Warehouse
The supplier has overseas warehouse(s)
to see all verified strength labels (25)
  • 2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
  • 2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
  • 2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
  • 2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
  • 2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
  • 2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Applications
Overview

Basic Info.

Model NO.
HWH380D
Pressure Pile Driver Type
Hydraulic Pile Driver
Pile Hammer Type
Hydraulic Hammer
Power Source
Diesel
Motor Power
55kw
Noise
With Noise
Certification
EPA, CE, ISO 9001:2000
Condition
New
Model
Hwh930zd
Loader Type
940
Engine Power
76kw
Chassis Body Width(mm)
1980
Vehicle Weight(Kg)
4820
Work Plan(mm)
700-3130
Drill Rod Diameter(mm)
68/75/85
Piling Efficiency(mm/Min)
1500/2000/250
Walking Speed(Km/H)
0~26
Rotating Motor Torque(Nm)
1600
Mast Stroke(mm)
2000
Drilling Depth(mm)
1650
Drilling Diarneter(mm)
0-300
Overall Dimension
4970*2700*2700mm
Working Weight
4100kg
Transport Package
Nude Package in Container
Specification
4875*2660*4550mm
Trademark
Hengwang
Origin
China Shandong
HS Code
8430509000
Production Capacity
500 Sets Per Month

Packaging & Delivery

Package Size
260.00cm * 270.00cm * 260.00cm
Package Gross Weight
2795.000kg

Product Description

Product Description
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
The HWH940 is a robust and efficient Road Guardrail Pile Machine, meticulously designed to meet the demands of modern construction projects. With a working weight of 6200 kg, this powerful machine is engineered to ensure stability and precision during operations. The heart of the HWH940 is its YUNNEI engine, delivering a formidable power output of 76 kW. This potent engine ensures that the Highway Piling Machine can tackle even the most challenging tasks with ease.

One of the standout features of the HWH940 is its #75 Power Head, which weighs 140 kg. This component is crucial for the machine's superior performance, enabling it to drive piles swiftly and efficiently. The overall dimensions of the Hydraulic Piling Machine are 5870 mm in length, 2700 mm in width, and 2700 mm in height, making it a compact yet powerful solution for construction sites
The primary use of the HWH940 Guardrail Pile Driver for Sale is in the installation of road guardrails, a critical aspect of highway safety and infrastructure development. Its design ensures that it can operate seamlessly in various terrains and weather conditions, providing reliable performance throughout.


In addition to its impressive technical specifications, the HWH940 Guardrail Piling Machine is known for its durability and ease of operation. It is equipped with advanced hydraulic systems that enhance its efficiency and reduce operational fatigue, making it a preferred choice for construction professionals.
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
Product Parameters
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
Model HWH940
Working weight 6200KG
Engine brand YUNNEI
Engine Power 76KW
Power Head #75
Power Head Weight 140Kg
Overall Dimension 5870*2700*2700
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
For more information, please click Contact:https://hengwang.en.made-in-china.com/contact-info.html
Detailed Photos
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
1. Powerful Performance:
   - Equipped with a 76 kW YUNNEI engine, the HWH940 delivers robust power, ensuring efficient and swift pile driving operations.
  

2. Precision Engineering:
   - Features a #75 Power Head weighing 140 kg, designed for optimal performance and precision in pile installation.


3. Heavy-Duty Construction:
   - With a working weight of 6200 kg, the machine offers exceptional stability and durability, ideal for rigorous construction environments.
4. Compact Dimensions:
   - The overall dimensions of 5870 mm x 2700 mm x 2700 mm make it a compact yet powerful solution, easily maneuverable on construction sites.


5. Hydraulic Efficiency:
   - Advanced hydraulic systems enhance operational efficiency, reducing fatigue and ensuring smoother operations.


6. Versatile Applications:
   - Perfectly suited for installing road guardrails, making it an essential tool for highway safety and infrastructure projects.
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
7. Durable Construction:
   - Built with high-quality materials, the HWH940 guarantees long-term durability and reliability, making it a sound investment for construction projects.


8. User-Friendly Operation:
   - Designed for ease of use, the HWH940 minimizes the learning curve, allowing operators to get to work quickly and efficiently.


9. Cost-Effective Solution:
   - Offering exceptional performance and durability, the HWH940 provides excellent value for money, ensuring a high return on investment for construction businesses.

 
10. Enhanced Productivity:
    -The powerful engine and efficient power head enable rapid pile driving, significantly increasing overall productivity on the job site.


11. Low Maintenance:
   - Designed with durable components and reliable engineering, reducing the frequency and cost of maintenance.


12.Comprehensive Support:
    -Comes with extensive after-sales support and service, ensuring that any issues are promptly addressed and minimizing downtime.
2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency Repair
Applications

2m Wheeled Guardrail Pile Driver Use for Field Engineering Construction of Highway Guardrail Installation/Maintenance and Emergency RepairThe loading guardrail drilling rig can adapt to various complex geographical environments and can be used in construction projects, large-scale water conservancy projects, repairing water and protecting dams, etc. The above are pictures of the loading guardrail drilling rig in different scenarios, and there are many more in use.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier