• Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
  • Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
  • Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
  • Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
  • Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
  • Piling and Pulling out Integrated Road Installation Guardrail Pile Machine

Piling and Pulling out Integrated Road Installation Guardrail Pile Machine

After-sales Service: Support
Warranty: 1 Year
Type: Vibration Piling Machine
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Piling and Pulling out Integrated Road Installation Guardrail Pile Machine pictures & photos
Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
US $8,000-18,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2015

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Applications
Overview

Basic Info.

Model NO.
HWH940ZQ
Pressure Pile Driver Type
Hydraulic Pile Driver
Pile Hammer Type
Hydraulic Hammer
Power Source
Diesel
Motor Power
55kw
Noise
Without Noise
Certification
CS, CE
Condition
New
Drilling Diameter
110-200cm
Left and Right Journey
40-70cm
Drilling Depth
1.4-2.6m
Power
37kw
Power Head
65
Weight
4t
Dimension(L*W*H)
5*2.2*2.74m
Impactor
110/150 Low Air Pressure
Piling Speed(M/M
2.7m/Min
Transport Package
Container
Specification
5870*2700*2700mm
Trademark
HW
Origin
Shandong
Production Capacity
500

Packaging & Delivery

Package Size
587.00cm * 270.00cm * 270.00cm
Package Gross Weight
6200.000kg
Lead Time
3 days (1 - 1 Pieces)
To be negotiated ( > 1 Pieces)

Product Description

 

Product Description

 

Piling and Pulling out Integrated Road Installation Guardrail Pile Machine

HWH940 Guardrail Pile Driver: Revolutionizing Highway Safety

The HWH940 Guardrail Pile Driver stands tall as a beacon of innovation in the realm of highway construction and safety. Engineered with precision and powered by the robust YUNNEI engine, this hydraulic powerhouse boasts a formidable working weight of 6200KG and an impressive 76KW engine power. 


Scope of Application
Designed to tackle the demanding challenges of highway construction, the HWH940 excels in the installation of guardrails, ensuring the safety of motorists and pedestrians alike. Its versatility extends beyond conventional guardrail installations, making it an indispensable tool for various infrastructure projects.


Functions
Equipped with the formidable #75 Power Head, weighing 140Kg, this machine delivers unparalleled performance in driving piles into the ground with precision and efficiency. Its hydraulic capabilities enable seamless operation, minimizing manual effort and maximizing productivity. The overall dimensions of 4970*2700*2700 ensure maneuverability and accessibility in diverse construction environments.


Conclusion
In conclusion, the HWH940 Guardrail Pile Driver stands as a testament to innovation in highway construction equipment. Its unparalleled performance, coupled with its versatility and efficiency, make it a cornerstone in the arsenal of guardrail installation equipment. As highways evolve and safety standards continue to rise, the HWH940 remains at the forefront, driving progress and ensuring the safety of travelers worldwide.

 

Scope of Application
Designed to tackle the demanding challenges of highway construction, the HWH940 excels in the installation of guardrails, ensuring the safety of motorists and pedestrians alike. Its versatility extends beyond conventional guardrail installations, making it an indispensable tool for various infrastructure projects.



Functions
Equipped with the formidable #75 Power Head, weighing 140Kg, this machine delivers unparalleled performance in driving piles into the ground with precision and efficiency. Its hydraulic capabilities enable seamless operation, minimizing manual effort and maximizing productivity. The overall dimensions of 4970*2700*2700 ensure maneuverability and accessibility in diverse construction environments.
Piling and Pulling out Integrated Road Installation Guardrail Pile Machine

Conclusion
In conclusion, the HWH940 Guardrail Pile Driver stands as a testament to innovation in highway construction equipment. Its unparalleled performance, coupled with its versatility and efficiency, make it a cornerstone in the arsenal of guardrail installation equipment. As highways evolve and safety standards continue to rise, the HWH940 remains at the forefront, driving progress and ensuring the safety of travelers worldwide.

 
Product Parameters
Model HWH940ZQ
Working weight 6200KG
Engine brand YUNNEI
Engine Power 76KW
Power Head #75
Power Head Weight 140Kg
Overall Dimension 4970*2700*2700

Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
For more information, please click Contact:https://hengwang.en.made-in-china.com/contact-info.html
 
Detailed Photos
Piling and Pulling out Integrated Road Installation Guardrail Pile MachinePiling and Pulling out Integrated Road Installation Guardrail Pile MachinePiling and Pulling out Integrated Road Installation Guardrail Pile MachinePiling and Pulling out Integrated Road Installation Guardrail Pile MachinePiling and Pulling out Integrated Road Installation Guardrail Pile Machine
If you want more details, please contact me and I will send it to you
 
Applications

Piling and Pulling out Integrated Road Installation Guardrail Pile MachineThe loading guardrail drilling rig can adapt to various complex geographical environments and can be used in construction projects, large-scale water conservancy projects, repairing water and protecting dams, etc. The above are pictures of the loading guardrail drilling rig in different scenarios, and there are many more in use.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Piling and Pulling out Integrated Road Installation Guardrail Pile Machine pictures & photos
Piling and Pulling out Integrated Road Installation Guardrail Pile Machine
US $8,000-18,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2015

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
291
Year of Establishment
2011-10-24